Timeline
MRIC history from inception (June 2001) to October 2003, including some events that led to the Cooperative formation. Sorted most recent to oldest.
Replacement of the network backbone with higher speed Trango 5.8Ghz gear begins
MRIC mentioned in Front Range Tech Business Journal.
A WIPOP is built on upper Sugarloaf mountain providing service to Upper Sugarloaf and Lower Magnolia road.
Magnolia Road and Sugarloaf Internet Cooperatives mentioned in FOXNews.com article.
MRIC.NET domain registered.
MRTG (traffic stats) graphs added to subscriber area.
The network is reconfigured to provide failover between our two upstream providers across the mesh.
Directional antenna is installed at the Lazy Z NOC. The wireless mesh linking our two NOCs via Thorodin is complete.
Mt. Thorodin repeater built and brought on line. Many thanks to our volunteer repeater builders.
MRIC appears in the Boulder County Business Report